Increasing turning radii and Recreation trail modification
Installing new 16” raw and treated watermain from US Hwy 14 Bypass to the North wellfield.
New traffic signals and replacement sidewalk ramps
Construction of a new 6 Million Gallons Per Day (MGD) water treatment plant.
Various roadways within the City of Brookings will be refinished with a chip or slurry seal surface.
Various road surfaces throughout the city will be refinished. This project includes work on select sidewalk ramps and sidewalks.
The current 5-foot sidewalk will be replaced with an 8-foot shared-use path for both pedestrians and cyclists
Improving the sidewalk network on the north side of 12th Street S between 17th Ave S and 22nd Ave S to an 8-ft wide concrete shared use path.